High-Rise Residential Development

Key Project Details

Parameter

Details

Project Type

High-Rise Residential Development

Location

India

Building Configuration

3 Residential Towers with common site & amenity areas

Primary Discipline

Architecture

Coordination

Structural + MEP

BIM Platform

Autodesk Revit 2024

Modeling Level

LOD 350

Clash Coordination

Autodesk Navisworks Manage

Visualization

Revit + Enscape

Project Overview

BIM Coordination​

High-Rise Residential Development

A multi-tower residential development in India comprising three high-rise residential towers, landscaped open spaces, internal roads, parking areas, and common amenity/recreational zones.

The project was developed as a coordinated BIM model to support design coordination, multidisciplinary review, and clash identification before construction.

Scope of Work

Key Deliverables

– Architectural Revit Model – LOD 350

– Federated Coordination Model

– Coordinated architectural, structural, and MEP model environment.

– Coordination Views

– Clash Reports

– Clash Viewpoints

– QA/QC Review Outputs

Project Stages

Design Inputs → Revit BIM Modeling → Structural & MEP Linking → Model Coordination → Navisworks Federation → Clash Detection → Clash Reporting → Design Revisions → Re-Clash → QA/QC → Coordinated BIM Model

Challenges & Solutions

1. Coordination Between Multiple Disciplines

Challenge: Architectural, structural, and MEP models required continuous coordination, with changes in one discipline potentially affecting other building elements.

Solution: Established a structured model-linking and coordination workflow, regularly federating the discipline models and reviewing interfaces to identify conflicts early.

2. Complex High-Rise Building Geometry

Challenge: The three towers included multiple levels, varying floor layouts, façade elements, balconies, cores, and shared building components, making consistency across levels challenging.

Solution: Used standardized Revit modeling practices, levels, grids, families, and view controls to maintain model consistency and improve coordination across the towers.

Value Delivered

Early Clash Identification

Navisworks-based clash detection enabled potential conflicts to be identified and addressed before construction activities.

Better Design Visibility

The LOD 350 BIM model provided a detailed 3D representation of the development, supporting design review and multidisciplinary coordination.

Improved Model Quality

Regular BIM QA/QC checks helped maintain consistency, accuracy, and reliability throughout the modeling and coordination process.

Project Outcome

Successfully developed a LOD 350 coordinated BIM environment for a three-tower high-rise residential development, integrating architectural, structural and MEP coordination with systematic Navisworks clash detection, reporting, revision and QA/QC workflows.